The project

 

We carried out an ambitious three-level office fit-out project covering three interconnected buildings. The work was carried out in close collaboration with the customer’s teams, in order to maintain the critical “broadcasting live” activity at all times. Thanks to effective synergy with the design team, we were able to adapt the architectural details to the building’s atypical volumes. Specialized acoustic materials were selected to meet the high demands of sound performance, while integrating an original layout.

The project, for a very high-tech oriented company, also included the fitting out of operational MDF and AV rooms, as well as numerous IT and AV requirements, making this site a real technical feat.