Projet

Procter & Gamble

The Project

 

Carried out in a real-life environment as part of a design-and-build process, our team delivered this project in eight months. The 2nd and 3rd floors, as well as the first floor, had to be refurbished to meet stringent acoustic requirements.

Découvrez nos autres projets

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.